Case Study

Call Us For Superior Service

Farm Cove Case Study

This was a very hard area to use. The client wanted it clean and easy. We prepped the area that was not already concrete, cleaned the concrete and then laid “Primavera”. This was attached to the concrete using adhesive as well as attaching it around the paved edge of the newly prepped base.

Case Studies

Half Moon Bay

This area was wet in the winter and dry in the summer. The customer struggled to grow grass on it all year round…

Mellons Bay

There was too much concrete in the entrance to the property for our client…

Howick

Around the existing swing structure we first put down a compacted metal base of Gap20 then topped it with Pap5…

Contact Us